What Your Builder Wishes You Knew

Sale Price: £5.99 Original Price: £11.99

Most of what goes wrong on a building job was decided before anyone arrived. Ask a builder why a job went badly and you will hear the same handful of answers: the brief was vague, the drawings were not finished, the kitchen was chosen too late, the party wall notice went out late.

This guide is written from the builder's side of the conversation, for the person paying. What a builder needs in order to price properly, how to read a quote and compare three of them, contracts, stage payments and retention, insurance, and the costs that sit outside the build contract, from the engineer and building control to the party wall award and VAT.

Then living through it: permits and notices, what gets found when the walls open, decisions and lead times, changes of mind, who is on your site, what goes out of use and for how long, and who speaks to whom. It finishes with sign-off, certificates and snagging, and what a finished job actually looks like. Figures are given as dated 2026 ranges from named sources.

48 pages, 16 chapters, with a one-sheet Homeowner's Planner. Instant PDF download after purchase.

Most of what goes wrong on a building job was decided before anyone arrived. Ask a builder why a job went badly and you will hear the same handful of answers: the brief was vague, the drawings were not finished, the kitchen was chosen too late, the party wall notice went out late.

This guide is written from the builder's side of the conversation, for the person paying. What a builder needs in order to price properly, how to read a quote and compare three of them, contracts, stage payments and retention, insurance, and the costs that sit outside the build contract, from the engineer and building control to the party wall award and VAT.

Then living through it: permits and notices, what gets found when the walls open, decisions and lead times, changes of mind, who is on your site, what goes out of use and for how long, and who speaks to whom. It finishes with sign-off, certificates and snagging, and what a finished job actually looks like. Figures are given as dated 2026 ranges from named sources.

48 pages, 16 chapters, with a one-sheet Homeowner's Planner. Instant PDF download after purchase.

STUDIO AKIVA GUIDESVOLUME 14 / BUILDING WORK
NOBODY CAN PRICE WHAT IS INSIDE A WALL.

Sixteen chapters on pricing, contracts, lead times and snagging, written from the builder's side of the conversation.

See the sixteen chapters 16 CHAPTERS · 48 PAGES · A4 PDF
Why this guide01

Most of what goes wrong
was decided before anyone arrived.

Ask a builder why a job went badly and you will get the same handful of answers, in the same order. The brief was vague, so the price carried risk. The drawings were not finished. The kitchen was chosen too late. The party wall notice was served late. None of that is a secret, but the person paying usually hears it for the first time when it has already happened. This guide puts it in front of you before you sign.

Your half of the job

The builder runs the site. You run the brief, the decisions, the money and the access, and those four decide more of the outcome than anything done with a trowel.

Three quotes, compared properly

Prices that differ by thousands are rarely prices for the same work. How to tell what each one includes before you compare the totals.

The money outside the contract

Engineer, surveys, party wall, building control and VAT, with dated ranges from named sources and when each one is actually paid.

What finished looks like

Snagging, certificates and retention, so the job ends properly and you know exactly what to hold back and when to release it.

48Pages
16Chapters
5%Typical retention
2 monthsParty wall notice
What’s inside02
  1. 01Why a Vague Brief Costs You MoneyWhat a builder hears when the brief is loose, and how an unclear line actually gets priced: with a margin for the worst plausible version of what you meant.
  2. 02What a Builder Needs in Order to PriceThe minimum pack for a comparable price, why planning drawings are not building drawings, the provisional sum, and the drawing that is missing most often.
  3. 03Reading a Quote, and Comparing ThreeEstimate, quotation and tender are not the same thing. What a comparable quote contains, why the cheapest is usually the least complete, and the deposit question answered plainly.
  4. 04Contracts, Stage Payments and RetentionWhich form of contract suits which job, what it should name beyond the price, stage payments tied to work done, and how retention works on a real job.
  5. 05Insurance, and Who Is Actually CoveredThe policies that should be in place before work starts, who holds each one, and what to check on each.
  6. 06The Costs That Are Not the Builder'sEngineer, surveys, party wall, building control and VAT: the money that sits outside the build contract and when it actually leaves your account.
  7. 07Permits, Notices and Who Waits for WhomPlanning, building control and party wall notices in the order they have to happen, and which of them can stop a start date.
  8. 08What Gets Found When the Walls OpenNobody can price what is inside a wall. What is commonly found, how an honest builder handles it, and why contingency exists.
  9. 09Decisions and Lead TimesThe programme runs on the longest lead, not the fastest trade. Which choices have to be made when, and why a kitchen ordered late decides your finish date.
  10. 10Changing Your Mind, Changing the JobHow variations are priced and agreed, why they cost more mid-job than at quote stage, and how to make one without a dispute.
  11. 11Who Is Actually on Your SiteThe builder, the subcontractors and the specialist trades, who instructs whom, and who is responsible for each.
  12. 12Week by Week, From Inside the HouseWhat a domestic build looks and feels like from the inside, stage by stage, so the difficult weeks are expected rather than alarming.
  13. 13What Goes Out of Use, and for How LongKitchen, bathroom, water, power and heating: what you lose during the works, for roughly how long, and how to plan around it.
  14. 14Who Speaks to WhomOne point of contact, instructions in writing, and the communication habits that keep a job calm.
  15. 15Sign-off, Certificates and Building ControlCompletion certificates, electrical and gas certification, and the paperwork you will need when you come to sell.
  16. 16Snagging, and What Counts as FinishedThe chapter most people wish they had read first: what a finished job actually looks like, how to snag it, and when retention is released.
  17. +The Homeowner's PlannerThe whole job on one sheet: the brief, the pack, the three quotes, the money outside the contract, decision dates, and the sign-off checklist.
Questions03
What format is it?

A 48-page A4 PDF. Your download link arrives by email straight after checkout, and you can read it on any device or print the Homeowner's Planner to keep on site.

Which edition is this?

UK. It is written for anyone employing a builder on their own home in the United Kingdom, with contracts, retention, party wall notices, VAT and building control sign-off as they apply here.

Is it written by builders?

No. Studio Akiva are interior designers. We spend a good deal of our working life standing between homeowners and builders, which is a useful place to hear the same misunderstandings recur. The guide is written from the builder's side of that conversation, for the person paying.

Is it legal advice?

No. Where a question belongs with a solicitor, an accountant or a party wall surveyor, the guide says so rather than guessing. Figures are given as dated ranges from named sources, so that you can ask a better question.

Can I get a refund?

This is digital content supplied immediately. At checkout you agree to the download starting straight away and acknowledge that this ends the usual 14 day cancellation right. Separately from that: if the link fails, the file will not open, or you received the wrong guide, email hello@studioakiva.com and we will put it right or refund you.

Would you rather we did it?

Studio Akiva is an award-winning London interior design studio and a twelve-time Houzz award winner. If you would like someone on your side of the table before you sign with a builder, book a free fifteen-minute discovery call.

Book a discovery call